Facilities Reports
The Arrowhead School Board is working through the long-range planning process. The Board believes its decisions should be driven by thorough analysis. A facilities study and corresponding cost estimates have been developed by outside consultants.
Facilities Assessment
A facilities assessment is a comprehensive review of a school’s buildings, building systems, and sites. The assessment has three primary components:
- Building Conditions - a study of AHS’ capital infrastructure, including roofing, windows, heating & cooling systems, electrical equipment plumbing and other systems.
- Educational Adequacy - the ability of the school building to support the school educational and co-curricular program.
- Capacity & Utilization - the ability of the building to accommodate the school’s enrollment and efficient use of educational space.
Facilities Assessment Summary Presentation
The summary facilities assessment findings presented to the School Board on December 13, 2023
Cost Estimates
An estimate of the accumulated 10-year capital maintenance needs of AHS. Important: these costs estimates cover only the Building Conditions portion of the facilities assessment. This document does not include the estimated cost of renovations or additions.
|